portfolio_page-template-default,single,single-portfolio_page,postid-15585,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-11.0,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2,vc_responsive
About This Project

GM Willow Run Assembly Plant

In a joint venture with Devon Industrial Group, MCM was selected to perform all environmental, demolition, recycling operations at the historic Willow Run assembly plant. Formerly referred to as the “Arsenal of Defense”, Willow Run became famous in the 1940’s for building B-24 bombers in less than 60 minutes. MCM began environmental cleaning activities including asbestos abatement and PCB oil remediation in September 2012. Both environmental and demolition operations will continue through August 2014.

Owner

RACER Trust

Location

Ypsilanti, MI

Size

4.5 Million Sq Feet

Completion

Q3 2014

Date
Category
Demolition, Projects